Name and Location:
Scott Stadium Sewage Detention System Repair; Charlottesville, VA

Owner:
University of Virginia

Scott Stadium Sewage Detention System Repair
Architect or Engineer:
Dewberry and Davis

Contract Amount:
$629,000

Completion Date:
July 2004

Services Provided:
CIPP and miscellaneous rehabilitative measures (manholes, laterals)

Description:

This project is a unique design-build project in which three 300 foot long, 66-inch diameter wastewater storage pipes beneath the lower level of the Scott Stadium parking garage were completely rehabilitated. The storage pipes served as storage for wastewater during Scott Stadium Sewage CIPP football games and stadium events.

Project challenges included having to install CIPP liners in the ground floor of a widely used parking facility and meshing of three different rehabilitative measures to accomplish the required goal. All efforts were designed and installed completed by Reynolds' internal personnel.

The 30-day duration turnkey rehabilitation efforts included 33 mm CIPP as well as cementitious and epoxy product application. Water exfiltration testing was completed after the efforts to prove integrity and watertightness of the completed system.
Install CIPP Liners